The safety of electric vehiclesIn 2014, “The National and Local Joint Engineering Research Center” settled in Nanjing JinlongThe national level research and development platform “The National and Local Joint Engineering Research Center” is located in Nanjing, which is committed to building the world-leading new energy vehicles which have the features of safety, reliability, economy and environmental protection. The vehicle has passed through more than 20 items of rigorous tests, including vehicle, battery, motor, electric control and so on. It also has the guarantee on the terms of driving safety.
-
The safety diagram of the body structure of the vehicleThe vehicle adopts the modular arrangement structure and lightweight high steel plate hot forming technology and other technologies. Combined with CAD/CAE/CAM analysis, constraint system simulation analysis, virtual simulation and the combination of calculation and test, it tries to construct the integrated design platform and the method of the body and chassis of the vehicle, so as to realize the integration of the constructions such as the structure optimization design of the vehicle, static and dynamic performance. The design and production of the lightweight structure of the vehicle are carried out, which effectively reduce the energy consumption of the vehicle.
-
Protective safetyThe level of the production reaches IP67, the wading depth is high; The measures of the passive safety are improved, the intelligent battery power system is installed. When the fire occurs, the battery compartment can quickly disengage and power off to prevent the disaster from deteriorating.
Charging way | Direct current | Direct current | Portable charger |
Charging time |
7M以上:2-5h 7M以下:1.5h |
7M以上:1-3h 7M以下:0.5h |
8-12h |
Grid interface |
Dedicated 400-700V, 120KW DC charger which can connect to 380V industrial power |
Dedicated 400-700V, 120KW DC charger which can connect to 380V industrial power |
3KW and 8KW can be optional and connected into the household power supply of 220V (only be applicable to the model under 7M) |
Charging interface | Dc charger -9 chips rechargeable gun (international) | Dc charger -9 chips rechargeable gun (international) | Portable DC charger |
-
01Stations constructed by Nanjing JinlongBased on the characteristics of customer sites and operation, Nanjing Jinlong has developed a comprehensive charging infrastructure solutions for power distribution, charging, monitoring and infrastructure and organized the construction to provide turnkey engineering services.
-
02Stations constructed by the customersNanjing Jinlong has developed a professional charging infrastructure design scheme based on the needs of the customers, which can assist customers to complete the construction of charging supporting facilities.
-
03Stations constructed by the third partyNanjing Jinlong provides candidate resources of third-party: The charging technicians of Jinlong assist customers to make butt joints and debug the charging technologies.
-
The advantages of the charging stationsThe capital investment in the early stage is small. It only needs to match the corresponding charging piles according to the number of vehicles. The requirements on the charging site are not high. The existing site can be used to construct the charging stations.
-
The disadvantages of the charging stationsThe capital investment in the early stage is small. It only needs to match the corresponding charging piles according to the number of vehicles. The requirements on the charging site are not high. The existing site can be used to construct the charging stations.
-
The advantages of the substationsThe floor space is small and the discharging time is quick. Self-purchasing model: The corresponding numbers of the batteries are matched according to the numbers of the vehicles. The rights of the use, management and ownership of the battery will be returned to the owner. The cost of the batteries will be generated. Battery leasing mode: The batteries are provided by the State Grid Corporation of China and the manufacturers of the batteries. The leasing way is adopted when using batteries. The management and ownership of batteries belong to the State Grid Corporation of China and the manufacturers of the batteries, which can greatly reduce the purchase cost of the batteries.
-
The disadvantages of the substationsBased on the characteristics of customer sites and operation, Nanjing Jinlong has developed a comprehensive charging infrastructure solutions for power distribution, charging, monitoring and infrastructure and organized the construction to provide turnkey engineering services.
-
(1) The charging systemAccording to the model and quantity of the vehicles, the number of the charging piles is matched and the area of the charging station is planned.
-
(2) The distribution systemAccording to the number and model of the charging piles, the suitable site is selected. The distribution plan is designed and the required power supply capacity is calculated.
-
(3) The civil engineering system
1.The rain tent for the charging piles;
2.Supporting office: Lounge, monitor room, toilet, distribution room, identification system, etc.
-
(4) The monitoring system
1.Vehicle information monitoring;
2.Monitoring of the information of the charging piles;
3.Security information monitoring
Involved departments
The construction of the civil construction system shall be performed by the design unit and the construction unit with professional qualifications
If the property ownership certificate of the charging station is needed, one needs to report to local Planning Bureau, the Construction Committee and other departments for the construction.
Involved departments
The State Grid Corporation of China; Transformer enlargement;
The design and construction of power supply should have the qualification materials which are recognized by a power supply company.
-
(1) The discharging system
According to the model and quantity of the vehicles:
1.Match the number of electricians and the number of robots;
2.Match the number of batteries;
3.Plan the area of the substation.
-
(2) The distribution systemMatch the corresponding transformer, distribution box, and cable wires.
-
(3) The civil engineering systemThe location of the electricians of the substations, the driving route of the vehicles and the building construction; Address: A series of supporting facilities such as lounge, office, toilet, distribution room and identification system.
-
(4) The monitoring system
1.Robot monitoring;
2.Monitoring of vehicle information;
3.Monitoring of charging information;
4.Security monitoring.
Involved departments:
1.The State Grid Corporation of China; The expansion and distribution box of the transformer;
2.Land of the substations; The approval of the Land and Resources Bureau;
3.The design of the substations: The design units whose qualification is approved by State Grid Corporation of China
Involved departments:
The construction of the civil construction system shall be carried out by the design unit and the construction unit with professional qualifications